Aluminium Formwork System

MAINI Construction Equipments has a proven track record of manufacturing and supplying quality products using latest technology like aluminium formwork system, scaffolding equipments, maini scaffolding, conventional scaffold, scaffolding parts and Formwork system in time all over India.

These possessing well organized manufacturing and sharing network, we offer various range of Aluminium Formwork provide for huge industry requirement. We manufacture these divan using premium materials of aluminium to ensure its reliable. Our products are extensively used in all the building industries due to its strength. They are also used as Concrete Frame.

Thursday, 3 October 2013

Table Formwork System

 

  Table Formwork is a large pre-assembled formwork and falsework unit, often forming a complete bay of suspended floor slab. It offers mobility and quick installation for construction projects with regular plan layouts or long repetitive structures, so is highly suitable for flat slab, and beam and slabs layouts. It is routinely used for: Residential flats, Hotels, Hostels, Offices, Commercial buildings.

table formwork system
 These systems lie of slab formwork "tables" that are reused on nonuple stories of a antiquity without existence dismantled. The collective sections are either raised per lift or "flown" by extend from one story to the next. Erstwhile in stance the gaps between the tables or table and paries are filled with "fillers". They variegate in regulate and situation as rise as their structure matter. The use of these systems can greatly concentrate the minute and recitation confinement involved in stage and striking the formwork. Their advantages are primo utilized by hulking area and organisation structure around one of these systems.


Name
Mobile No
Email Id
Message

Tuesday, 3 September 2013

Multilevel Car Parking System, Multiparking system by Maini



Multiparking System providing dependent parking spaces for 2 cars one on top of the other each. The lower vehicle parks directly on the floor plate. The vehicle parked on the bottom must be driven out before lowering the platform.
The height of the platform can be adjusted flexibly (even subsequently).
Adjustment of maximum load of 2,500 kg can be made subsequently. Dimensions are in accordance with the underlying dimensions of parking pit, height and width.
The parking bays are accessed horinzotally (installation deviation ± 1%).
Vehicles are positioned on the upper parking space using wheel stops on the right side (adjust according to operating instructions).
Operation via operating device with hold-to-run-device using master keys.
The operating elements are usually mounted either in front of the column or on the outside of the door frame
Operating instructions are attached to each operator's stand.
For garages with doors at the front of the parking system the special dimensional requirements have to be taken into account.

Multiparking system consisting of :
    - 2 steel pillars with bases that are mounted on the floor (short or long steel pillar bases can be selected
      optionally).
    - 2 sliding platforms (mounted to the steel pillars with sliding bearings)
    - 1 platform
    - 1 mechanic synchronization control system (to ensure synchronous operation of the hydraulic cylinders while
      lowering and lifting the platform)
    - 1 hydraulic cylinder
    - 1 automatic hydraulic safety valve (prevents accidental lowering of the platform while accessing the
      platform)
    - Dowels, screws, connecting elements, bolts, etc.
    - The platforms and parking spaces are end-to-end accessible for parking!

Platforms consisting of :
    - Platform base sections
    - Adjustable wheel stops
    - Canted access plates
    - Side members
    - Cross members
    - Screws, nuts, washers, distance tubes, etc.

Hydraulic system consisting of :
    - Hydraulic cylinder
    - Solenoid valve
    - Safety valve
    - Hydraulic conduits
    - Screwed joints
    - High-pressure hoses
    - Installation material

Electric system consisting of:
    - Operating device (Emergency Stop, lock, 1 master key per parking space)
    - Terminal box at wall valve
    - Electrical locking device
    - Chain control

Hydraulic unit consisting of:
    - Hydraulic power unit (low-noise, installed onto a console with a rubber-bonded-to-metal mounting)
    - Hydraulic oil reservoir
    - Oil filling
    - Internal geared wheel pump
    - Pump holder
    - Clutch
    - 3-phase-AC-motor (3.0 kW, 230/400 V, 50 Hz)
    - Contactor (with thermal overcurrent relay and control fuse)
    - Test manometer
    - Pressure relief valve - 

                           Multilevel Car Parking System


car parking system

 Electrical Installation

car parking system

Illustrated Maximum Approach
Illustrated maximum approach for car parking system
Add caption

Tuesday, 23 July 2013

Maini Aluminum Formwork System

  

              MAINI Construction Equipments Pvt. Ltd.  

MAINI Construction Equipments Pvt. Ltd. has a proven track record of manufacturing and supplying quality products using latest technology like aluminium formwork system, scaffolding equipments, maini scaffolding, conventional scaffold, scaffolding parts and Formwork system in time all over India. 



http://www.mainiformwork.com/almunium-formwork-system.htm


      Maini Software is a special in-house designed software which provides a 3D platform for working. Maini software is the perfect solutions for fast, professional planning of Maini formwork & scaffolding systems.

From a simple basement to a complicated industrial building, from wall & slab formwork to platform systems & scaffolding – the most diverse problems are solved with Maini software.

Maini programs are continually adjusted to suit the product development & are also used by Maini sales and design engineers. This ensures that the systems and their guidelines are always up-to date.

Precise item lists ensure that costs arise only for material volumes you actually need. Formwork material is scheduled correctly for the project and is deployed and operated at full capacity as far as possible.

Complicated areas are recognized and already dealt with in the planning phase. The construction site is supplied with the material it actually needs and this optimizes logistical expenditure. Simple planslead to notable time savings. Each component, without detour, joins directly to the right position.